Intermountain Contractor’s Top Projects of 2009 in Utah and Idaho
11 Pioneer Crossing $140 M
Owner: UDOT
GC: Kiewit-Clyde JV (Kiewit Western; W.W. Clyde & Co.)
Engineer: N/A
The Pioneer Crossing project in Utah County consists of the construction of a five-lane arterial between Redwood Road and 300 East in Lehi to the American Fork I-15 Interchange. The existing diamond interchange will be replaced with a single point urban interchange (SPUI). The project will include construction of a 60-inch water main within the project right-of-way between Redwood Road and approximately 300 East.
Click
here for Main Feature Story >> |