Features
 Current Features
 Past Features





Cover Story - June 2009

Intermountain Contractor’s Top Projects of 2009 in Utah and Idaho

22 Huntsman Cancer Hospital Phase 2B $85 M

Owner: Huntsman Cancer Institute
GC: Okland Construction Co.
Architect: Architectural Nexus
Civil: Van Boerum & Frank Assoc.
Electrical: Spectrum Engineers
Mechanical: Van Boerum & Frank Assoc.
Structural: Reaveley Engineers+Assoc.

advertisement

The Huntsman Cancer Hospital at the University of Utah in Salt Lake City was originally built as a 50-bed inpatient and outpatient facility. This program and design expands the inpatient area to 100 beds including intensive care and 15 bone marrow transplant beds. The outpatient area is complemented by a 16-exam room suite of additional outpatient clinic area. A replacement of the infusion area with a 36-bed infusion suite offers stunning views of the Salt Lake Valley and Oquirrh Mountains. Other aspects include a one-of-a-kind surgery/MRI suite combination, a 4-room operating suite expansion, additional radiographic capability and a dedicated breast care clinic with diagnostic and treatment capabilities. The result is a 156,000-sq-ft expansion on 6 levels. Phase 2B began May 2008 and will conclude in mid-2011.

 

Click here for Main Feature Story >>

Click here for more Features >>

 



 

Sponsors

© 2009 The McGraw-Hill Companies, Inc.
All Rights Reserved