Intermountain Contractor’s Top Projects of 2009 in Utah and Idaho
28 Wasatch High School $61.8 M
Owner: Wasatch County School District
GC: Layton Construction Co.
Architect: Sandstrom Assoc. Architecture
Civil: Berg Civil Engineers
Electrical: Nielson Engineering
Mechanical: Nielson Engineering
Structural: Bsumek Mu
Key Subs: Brahma Group; IMS Masonry; J B Gordon Construction; Kemp & Hilton; Mollerup Glass Company; Perry Olsen Drywall; Preferred Fire Protection; Steel Encounters; Taylor Electric
The 308,000-sq-ft high school in Heber, Utah will consist of three floors containing administrative offices, classrooms, computer labs, a media center and auditorium. The facility will also have three gymnasiums, a geo-dome skylight in the middle of the commons area that is 32 feet in diameter, a greenhouse, athletic facilities and associated support facilities. Unique characteristics of the structure include a 50-foot fly loft for state rigging and a sub-grade main gymnasium in architectural concrete. The project will conclude in June 2009.
Click
here for Main Feature Story >> |